SRE LiftTech has successfully completed the installation and commissioning of a customized 3,000 kg Goods Lift system at a premier 300,000 sq. ft. warehousing and distribution hub in Sanand GIDC.
### Turnkey Engineering Execution
The project presented unique architectural constraints requiring a pitless floor installation with customized ramp integration. Our project team executed:
- Full structural steel enclosure with perimeter wire mesh safeguarding.
- Multi-stop micro-switch sensor positioning across Ground, Mezzanine, and 2nd floor levels.
- IP65 weatherproof push-button stations on each landing with emergency stop mushroom heads.
The system now handles over 120 cargo transfers daily, drastically optimizing vertical goods movement between warehouse levels.
Key Takeaways & Technical Highlights
- 18-meter vertical elevation across 3 warehouse storage tiers
- Pitless configuration with heavy-gauge low-incline entry ramp
- Turnkey commissioning completed in 14 working days with zero downtime
- Fully enclosed steel safety cage meeting OSHA and EN-81 safety codes
On-Site Installation Photo Album